Manutenzione ponti - Ponte Scomenzera
Geographical Framework
Manutenzione ponti - Ponte Scomenzera
Project

Description

Functional and structural redevelopment of the Scomenzera Bridge, of great historical interest as the first bridge with an entirely welded metal structure. Of strategic importance as the only vehicular access, it allows you to connect the Ponte della Libertà and Piazzale Roma with the area of ​​Santa Marta and San Basilio.

Economics

The cost of the work amounts to €1.3 million financed by NASPA funds

Objective

The intervention aims at the conservative restoration of the metal structure, to bring the bridge back to its original carrying capacity, which is largely sufficient for today’s traffic.

Benefits

Restore the safety level of the structure, which has deteriorated over time;

Improve the connection between the port area and the main access roads to the city;

Increase safety during transit with the installation of guard rails and rainwater disposal;

Work Plan

Residual duration: 19 months
Step 1
Design
Step 2
Tender (4 months)

October 2023
Notice publication

Step 3
Execution of Works (13 months)

February 2024
Start of Works

from April 2025
Tests