Description
Project concerning the demolition and reconstruction of the Molin Bridge on the foundations of San Basilio in Venice, with an adjoining pedestrian walkway to overcome architectural barriers, which became necessary given the deteriorating conditions of the structural elements.
Economics
The cost of the work amounts to €600 thousand financed by NASPA funds
Objective
Restore an adequate level of safety to pedestrian circulation and ensure that all users overcome architectural barriers
Benefits
Restore the safety of the structure
Improve the connection between the historic city and the port area
Allow correct utility for everyone
Work Plan
Residual duration: 8 mesi
Step 1
Design
Step 2
Tender (7 months)
Step 3
Execution of Works (6 mesi)
February 2024
Start of Works
July 2024
Tests