Environmental adaptation and redevelopment of the Lombardy, Bolzano and Trento docks in the Commercial Port of Venice to be carried out in phases

  1. HOME
  2. ››
  3. Projects and Sustainability
  4. ››
  5. Infrastructural Projects
  6. ››
  7. Other projects
  8. ››
  9. Environmental adaptation and redevelopment...
Adeguamento ambientale e riqualificazione delle banchine Lombardia, Bolzano e Trento nel Porto Commerciale di Venezia da realizzarsi per fasi
Geographical Framework
Adeguamento ambientale e riqualificazione delle banchine Lombardia, Bolzano e Trento nel Porto Commerciale di Venezia da realizzarsi per fasi
Project

Description

The intervention involves the redevelopment of the Lombardy, Bolzano and Trento quays through the creation of a waterproof barrier along the longitudinal development, their structural consolidation, the creation of a rainwater collection system and the arrangement of the flooring.

Economics

The cost of the work amounts to €28.9 million financed by FSC MITE funds

Objective

The project aims to structurally adapt the docks, adapt the dock floor and furnishings, create a water treatment network for discharge into the lagoon and a perimeter boundary for environmental purposes.

Benefits

Avoid contamination of the lagoon by groundwater and surface runoff from the yards;

Allow more efficient docking and handling at the pier;

Ensure the safety of the stability of the dock;

Work Plan

Residual duration: 22 months
Step 1
Design
Step 2
Tender (4 months)

April 2023
Notice Publication

Step 3
Execution of Works (22 months)

September 2023
Start of Work

from July 2026
Tests