

Description
The intervention involves the redevelopment of the Lombardy, Bolzano and Trento quays through the creation of a waterproof barrier along the longitudinal development, their structural consolidation, the creation of a rainwater collection system and the arrangement of the flooring.
Economics
The cost of the work amounts to €28.9 million financed by FSC MITE funds
Objective
The project aims to structurally adapt the docks, adapt the dock floor and furnishings, create a water treatment network for discharge into the lagoon and a perimeter boundary for environmental purposes.
Benefits
Avoid contamination of the lagoon by groundwater and surface runoff from the yards;
Allow more efficient docking and handling at the pier;
Ensure the safety of the stability of the dock;
Work Plan
Residual duration: 22 months
April 2023
Notice Publication
September 2023
Start of Work
from July 2026
Tests